Lectures of apl. Prof. Dr.-Ing. Volker Berkhahn

Conference Papers

  • Berkhahn, V.; Kleiber, M.; Schiermeyer, C.; Weber, S. (2018): Modeling Traffic Accidents Caused by Random MisperceptionIEEE Conference on Intelligent Transportation Systems (ITSC), Maui, HI, USA.
    DOI: 10.1109/ITSC.2018.8569483
  • Pascucci, F.; Rinke, N.; Schiermeyer, C.; Berkhahn, V.; Friedrich, B. (2018): Should I Stay or Should I Go? A Discrete Choice Model for Pedestrian–Vehicle Conflicts in Shared SpaceTransportation Research Board (TRB) 97th Annual Meeting, Washington DC, USA.
  • Berthold, T.; Leichter, A.; Rosenhahn, B.; Berkhahn, V.; Valerius, J. (2017): Seabed sediment classification of side-scan sonar data using convolutional neural networks2017 IEEE Symposium Series on Computational Intelligence (SSCI), Honolulu, HI, USA.
    DOI: 10.1109/SSCI.2017.8285220
  • Rinke, N., Schiermeyer, C., Pascucci, F., Berkhahn, V., Friedrich, B. (2017): A multi-layer social force approach to model interactions in shared spaces using collision predictionTransportation Research Procedia, 25: 1249–1267.
    DOI: 10.1016/j.trpro.2017.05.144
  • Schiermeyer, C.; Pascucci, F.; Rinke, N.; Berkhahn, V.; Friedrich, B. (2017): Modeling and Solving of Multiple Conflict Situations in Shared SpacesTraffic and Granular Flow (TGF) 2017, Washington DC, USA.
  • Pascucci, F.; Rinke, N.; Schiermeyer, C.; Friedrich, B.; Berkhahn, V. (2015): Modeling of shared space with multi-modal traffic using a multi-layer social force approachTransportation Research Procedia; 10: 316-326.
  • Wischmeier, C.; Kerfriden, P.; Berkhahn, V. (2015): Isogeometric coupling of the Reissner-Mindlin plate and solids using Nitsche's method with an analytical stability criterionIII. International Conference on Isogeometric Analysis, Trondheim, Norwegen.
  • Bode, M.; Berkhahn, V. (2014): Multiskalenansatz für reaktive Prozess- und AblaufplanungASIM 2014, 22. Symposium Simulationstechnik.
  • Albrecht, C.; Hosser, D.; Abu Abed, W.; Rinke, N.; Berkhahn, V. (2012): Numerical simulations of occupants evacuation within the context of life cycle engineering in building constructionIALLCE 2012 - 3th International Symposium on Life-Cycle Civil Engineering, Wien.
  • Asche, C.; Berkhahn, V. (2012): T-spline surface design in engineering14th International Conference on Computing in Civil and Building Engineering (ICCCBE), Moskau.
  • Berthold, T.; Milbradt, P.; Berkhahn, V. (2012): Morphodynamic Modeling in the German Bight Using ANNProceedings of 10th International Conference on Hydroscience and Engineering, Orlando, FL.
  • Bode, M.; Schiermeyer, C.; Berkhahn, V. (2012): Job scheduling using event-discrete simulation, pre-optimisation and just-in-time consideration of disturbance factorseWork and eBusiness in Architecture, Engineering and Construction: ECPPM 2012.
  • Rinke, N.; Gösseln, I.; Berkhahn, V. (2012): High-level Petri nets for modeling of geodetic processes and their integration into construction processesECPPM 2012 - eWork and eBusiness in Architecture, Engineering and Construction, Reykjavik.
  • Berkhahn, V.; Berthold, T.; Milbradt, P. (2010): B-Spline Volumes for Time Dependant Bathymetry ModellingProceedings of International Conference on Hydro-Science and Engineering (ICHE), IIT Madras, Chennai, India.
  • Berthold, T.; Milbradt, P.; Berkhahn, V. (2010): Determination of Network Topology for ANN-Bathymetric ModelsProceedings of 9th International Conference on Hydroscience and Engineering, IIT Madras.
  • Berthold, T.; Milbradt, P.; Berkhahn, V. (2010): Determination of network topology for artificial neural network bathymetric modelsProceedings of International Conference on Hydro-Science and Engineering (ICHE), IIT Madras, Chennai, India.
  • Höcker, M.; Berkhahn, V.; Kneidl, A.; Borrmann, A.; Rank, E. (2010): Graphbased approaches for simulating pedestrian dynamics in building modelsEuropean Conferences on Product and Process Modelling (ECPPM), Cork, Ireland.
  • Hofmann, F.; Bode, M.; Berkhahn, V. (2010): Logistic Cargo Loading OptimisationEuropean Conferences on Product and Process Modelling (ECPPM), Cork, Ireland.
  • Hofmann, F.; Berkhahn, V.; Milbradt, P. (2008): Decision support in Petri nets via genetic algorithmseWork and eBusiness in Architecture, Engineering and Construction: ECPPM.
  • Hofmann, F.; Berkhahn, V. (2007): Adjusting a tool for collaborative planning to requirements in practice24th CIB-W78 Conference, Maribor.
  • Berkhahn, V.; Kaapke, K.; Rath, S. (2006): Trimmed Surfaces in a Hybrid Meshing ApproachInternational Association of Hydraulic Engineering and Research Congress (IAHR), Madras.
  • Berkhahn, V.; Mai, S. (2006): Detection of Terrain Features Embedded in a Pre-Processor for Topographic Data7th International Conference on Hydroinformatics (HIC 2006). Nice, France, Nice.
  • Stilhammer, J.; Klinger, A.; Berkhahn, V. (2006): Navigation within hierarchical graph systems for process modellingEuropean Conference on Product and Process Modelling (ECPPM), Valencia.
  • Berkhahn, V.; Kaapke, K.; Rath, S.; Pasche, E. (2005): Breakline Detection Embedded in a Hybrid Meshing SchemeProceedings of the XXXI International Association of Hydraulic Engineering and Research Congress, Seoul.
  • Berkhahn, V.; Kaapke, K.; Rath, S.; Pasche, E. (2005): A Hybrid Meshing Scheme Based on Terrain Feature IdentificationProceedings of the 14th International Meshing Roundtable, San Diego, California.
  • Berkhahn, V.; Klinger, A.; Rueppel, U.; Meissner, U. F.; Greb, S.; Wagenknecht, A. (2005): Process Modelling in Civil Engineering based on Hierarchical Petri NetsProceedings of the 22th International Conference on Information Technology for Construction CIB-W78, Dresden.
  • Berkhahn, V.; Komorowski, S. (2005): Neural Networks in the Re-Engineering Process based on Construction DrawingsProceedings of the 22th International Conference on Information Technology for Construction CIB-W78, Dresden.
  • Rath, S.; Pasche, E.; Berkhahn, V. (2005): Modeling High Resolution Remote Sensing Data for Flood Hazard AssessmentProceedings of the American Society for Photogrammetry and Remote Sensing ASPRS, Maryland.
  • Berkhahn, V.; Kinkeldey, C.; Schleinkofer, M.; Rank, E. (2004): Re-Engineering Based on Construction Drawings-From Ground Floor Plan to Product ModelProceedings of the Xth international conference in computing in civil engineering, ICCCBE, Weimar.
  • König, M.; Klinger, A.; Berkhahn, V. (2004): Process modelling in building engineeringProceedings of the European Conference on Product and Process Modelling in Building and Construction Industry (ECPPM).